Micks Chocolate Factory

PROJECT DETAILS
• Client: D-Collative
• Location: Hyderabad, Telangana, India
• Built-up Area: 1,23,000 sq.ft


HIGHLIGHTS
• Chocolate factory designed for a span of
15mx24m grids with floor loads of 10kN/m2
• PEB roof was designed such a way that the entire
factory machinery pipelines and other service
lines are suspended from a secondary framing
taken from roof PEB framing

Steel Structures Projects